Different Phases of Swimming Pool Construction

Building an in ground swimming pool is the culmination of different phases of swimming pool construction in Sunshine Coast. This blog will give you a brief understanding of the construction cycle. It all begins with the desire to have a pool in your own backyard.

Design & Engineering

The first place most homeowners look for qualified swimming pool contractors is the local phone book, and by word of mouth from others who have built a pool. After the initial interview process, you will have a good idea what your swimming pool will cost to have built. The contractor or consultant will provide a design and a complete bid for your acceptance. With a contract in hand, the contractor will obtain all necessary engineering from a qualified structural engineer. The contractor will then submit for permits from the local jurisdiction. At this point, it might also be necessary for the contractor to apply for a Home Owners Association(HOA) approval depending on your local community requirements. Once the building permit is obtained, the construction kicks off in high gear.

Layout & Excavation

This is one of the most exciting phases of swimming pool construction, excavation. Excavation is the digging and forming of the swimming pool. The very first thing the excavation crews do is the pregrade. Pregrade is the clearing of the pool site and the grading of the area for the swimming pool. This allows the crew to paint on the ground the final shape of your pool and at the same time the crew will stake the perimeter of the pool and add forms for the structure of the pool. The typical time needed to dig a pool depends on various factors. These factors include: access, soil conditions, and overall size and depth of the pool. Most pools these days are dug in 1 to 2 days.

Rough Plumbing & Electrical

Once the pool is dug, it’s time to move on to the rough plumbing and electrical. This is where all of the trenches will be dug for all the pipes and conduits necessary to operate your pool. Sometimes, the rough plumbing & electrical will be broken down in a couple of parts, otherwise all trenching and installation of the pipes and conduits will be done at the same time. This includes installation of the suction and return lines, water-feature lines, vacuum cleaner lines, fill lines, solar inlet and returns, gas lines for swimming pool heater and future barbecues and firepits, and the electrical service line. In most cases this will take 2-3 days to complete, and may be done either before, during or after steel.

Equipment Set

The excitement builds, you’re almost done and ready to swim. At equipment set, either your pool service company or the plumbing and electrical company will return to install all of the equipment. The lights will be installed, control panels will be hooked-up, all pumps, heater and filter will be mounted to the equipment pad and plumbed. This normally is routinely completed within one to two days. All ready for the filling of your pool with water. But wait, we’re missing the all-important pool surface.

This has been a brief article describing the in ground swimming pool process. A swimming pool is the culmination of many individual persons, each an experienced veteran of his or her trade. For most homeowners, a licensed contractor can guide them through the process. For others, the option of building their own pool and acting as their own general contractor can save them thousands of dollars but requires a deeper level of understanding.